Potasio Río Colorado - Rio Tinto

Feb/2006

Rio Tinto Group

Joint work with Canadian consultants within the frame of Potasio Rio Colorado Project, fertilizer storage facility preliminary project and Mineral fertilizer delivery facilities at Bahía Blanca city Port:

  • Plant environmental impact and cost analysis of the plant (2004).
  • Design of railway access.
  • Design of a berth for Panamax vessels at Bahía Blanca city port.
  • Integral on-shore and offshore geotechnical research for Deep Foundations Project for the construction of a new dock at Bahía Blanca city Port 2004 -2007.
  • Dock foundations detailed design.
  • Administrative buildings project.
  • Storing silos project (structural and deep foundations detailed design).
  • Second stage of deep foundations geotechnical characterization and preliminary project  (relocation of storage silos and railway access analysis).
  • Geotechnical characterization for a mining and processing plant unit, also preliminary project in Malargue (Mendoza), for the 2005-2007 project.
  • Sanitary services feasibility analysis and preliminary project for Bahía Blanca Port installations. 
  • Characterization of aggregates for concrete manufacturing and earthfill dirt.
  • In site Geotechnical Bearing Capacity Testing and laboratory tests for Alternative salt pile location at Malargue mine site Mendoza pvce.

 

Certifications

In 2018 we certified the
ISO 9001 Standard (2015)

An active commitment towards efficiency improvement

Download our quality policy ISO 9001