In charge of Road and Hydraulics Works audits and audit reviewers for the Municipal Restrengthening Program implemented by the Buenos Aires Province., P.A.R.E.F.F. (State Reformation Support and Fiscal Strenghtening Program), Ministry of Economy, La Plata, for the Inter-American Development Bank.
Paving works at RP 45 Rojas-Ascencio –Angelita
Bridge and Paving Works at CNO.050-03-TR.R.N33-E.V.Bunge
Paving works at CAMINO SUIPACHA-RIVAS (102-03)-RP43
Bridge and Paving Works at C* al Sur-Tram Islas-Valdés
Paving works at Av. Irigoyen en ACC. Loc. Chacabuco D/ RN7
Paving works at C*San Pedro Vuelta de Obligado II ETAPA
Paving works at Av. Circunvalación I ETAPA, General Villegas
Paving works for Heavy load Traffic at R.P.20 Ranchos-II ETAPA
Paving works at South Access - II ETAPA, Chascomus.
Paving works at the access to Estación López
Paving works at Avenida Circunvalación II ETAPA-SARMIENTO-BRAGADO
Paving works at Roads of Provincial network from San Antonio de Giles - Azcuenaga acceso a Cucullu-RN7
Paving works at Access to Cucullu POR R.N.7-from San Antonio de Giles - KM4.
Paving works at Roads of Provincial network Access to Cucullu R.N.7-KM.4-KM8
Paving works at Roads of Provincial network Access to Cucullu-TR.KM8-Azcuenaga
Paving works for Heavy load Traffic at Carlos Casares (Phase I)
Paving works for Heavy load Traffic at Carlos Casares (Phase II)
Paving works at Av. H. Yrigoyen e/ Colon y Av. del Valle Larraburu, CAMPANA
Paving works at Av. del Trabajo e/ Lavalle y Darwin y Corrientes, Bahía Blanca
Paving works at Av. Prongles e/ Av. Del Valle y Av. Colon, Olavarria
Paving works at Av. 59 e/ Calle 74 y 112 Necochea
Paving works at Av. Bs As e/Calle Mitre y Av. Tucumán, Gral. Madariaga
Paving works at Av. F. Ameghino, Tres Arroyos
Paving works for Heavy load Traffic RN 205 - Molino II ETAPA, Cañuela
Paving works at Av. 75 E/ AV. 74 Y AV. 98, Necochea
Paving works at Calle Antártida Argentina y Vías F.F.G.M. Zárate
Paving works at R.P.57-TR.R.P.2-Lezama-Pila
Paving works at Av. Circunvalación II ETAPA (AV. 47, AV. 2, AV.40)Mercedes
Paving works at Calle San Martin y Acceso a Fac de Agronomía -Azul
Paving works at Trenque Lauquen
Drainage Construction at National Highway Nº 11 Bº Sta.Elena, Mar del Plata.
Construction in Playa Grande y Punta Iglesias, Mar del Plata.
Coast Defense Construction at Torreón, Mar del Plata.
Group of Coast Defenses (Seven) at Sta. Clara del Mar, Buenos Aires.
An active commitment towards efficiency improvement
Download our quality policy ISO 9001