2009
Risk analysis for a Fuel Oil discharge and Pumping facility from dock 9 of BUNGE S.A. Bahía Blanca Berth facilities at Bahía Blanca city port to nearby Piedrabuena Power House.
2008
Environmental Impact Assessment for dredging operations to deepen the existing port access channel draft.
2006
Environmental audit of a tract of land known as "Loma Paraguaya" located in the outskirts of Bahía Blanca city. Ten three-inches (internal diameter) monitoring wells were bored and soil and groundwater samples were chemically characterized to establish potential environmental liabilities.
2004 / 2005
EIA requested by the Bahía Blanca Port Consortium for the construction of a dock with the following characteristics: 320 meters between moorings at each end, apt for the operation of tank barges of 70,000 DWT , 250-meter length and 13.60- meter draft. This dock will be located next to the already-existing one, which is owned by “Luis Piedrabuena” Thermoelectric Power Plant berth.
2001 / 2002
EIA requested by the Bahía Blanca Port Consortium for maintenance dredging operations at the access channel to the Bahía Blanca Port.
An active commitment towards efficiency improvement
Download our quality policy ISO 9001