Cia. Mega Projects

Ene/2001

Cia. MEGA

2009

Environmental and Risk Assessment of a CO2 pipeline from Cia. MEGA plant to Profertil S.A. plant.

Assessment study for the installment of a steam turbine and power generator (2MW)

 2007

Environmental Impact Assessment of a pipeline during operational and maintenance works. This pipeline is owned by MEGA S.A. and it runs along 600km from Loma La Lata (Neuquén) to the processing and separation plant located at the Bahía Blanca Port. The pipeline transports a mix of butane, ethanol, propane, gasoline and carbon dioxide, known as liquefied natural gas (LNG). Under Resolution 123/2006 of Fuels Secretariat.

2006

Environmental Impact Assessment for installation of a SH2 removal unit out from the CO2 vented current.

2005

In charge of groundwater, surface water and soil characterization at MEGA S.A. plant since 2005 and at MEGA S.A. Pipeline since 2007.

Since 2004

Annual Environmental Audits on capture of water for fire extinguishing systems ( Bahía Blanca), since 2004 to present date.

Since 2001

Annual Hazardous Waste Affidavits to renew authorizations since 2001 to present date.

Certifications

In 2018 we certified the
ISO 9001 Standard (2015)

An active commitment towards efficiency improvement

Download our quality policy ISO 9001