Oil TAnking Quality control of piled foundations

Ago/2024

UTE DyOPSA-CONCRETNOR- TREVI

Quality control of all piled foundations of the viaduct and  berth project at “Puerto Rosales Terminal” pertaining to Oil Tanking Ebytem storage plant, Puerto Rosales.

Piles of 1200 to 1600 mm diameter and up to 40 meters length. Execution of integrity tests (PIT) on all piles, Cross Hole (CH) integrity tests and Dynamic load tests (PDA) of large diameter piles Berth (in water) by means of a 10 ton frame specifically designed for this purpose with load capacity over 500 tons.

Certifications

In 2018 we certified the
ISO 9001 Standard (2015)

An active commitment towards efficiency improvement

Download our quality policy ISO 9001